Proprietary Process Chemistry // Global Technology Licensor

The Architecture of Molecular Mineral Recovery

Closed-loop hydrometallurgical systems transforming raw feedstocks, complex ores, and mine tailings into high-purity industrial oxides, US critical defense minerals, and certified bullion in one continuous operation.

Recovery Paradigm
Multi-Element Dissolution
Ore Monetization
70% – 90% Mass Monetized
Environmental Standard
Zero-Cyanide / Closed-Loop
Macro Threat & Market Opportunity

The Fragile Western Supply Chain

Western defense, technology, and clean energy depend dangerously on foreign-monopolized mineral refining bottlenecks.

85% Foreign Monopoly

High-Purity Silicon (SiO₂)

China controls 85% of global silicon metal and 95% of solar polysilicon. Western microelectronics and photovoltaic wafer supply lines are critically exposed to export restrictions.

Semiconductor & Solar Glass
Foreign Smelting Choke

Platinum Group Metals

Platinum, Palladium, Rhodium, and Iridium are vital for green hydrogen electrolyzers, fuel cells, and emission catalysts. More than 80% of global refined volume is tied to Russia and South Africa.

Catalysis & Hydrogen Economy
Severe Export Risk

Titanium (Ti)

Essential for commercial aerospace, naval hulls, and advanced defense munitions. Western supply chains remain critically dependent on hostile state smelting and export quotas.

US Strategic Defense Priority
100% Offshore Refining

Scandium & Battery Minerals

100% of refined scandium and rare earth alloys used in aerospace and high-strength defense applications were processed in China in 2023. Western OEMs have no domestic alternative.

Lightweight Defense Alloys
Strategic Imperative: USGS 2025 Critical Minerals List, DoE Energy Directives, and EU Critical Raw Materials Act (CRMA) mandate domestic extraction and non-adversarial processing.
Sovereign Supply Security
The Structural Industry Failure

Conventional Mining Monetizes Less Than 5% of the Rock

Current extractive metallurgy relies on obsolete single-commodity flows that destroy economic margins and amass multi-generational environmental liabilities.

The Broken Conventional Model
  • Single-Target Extraction: Smelters calibrate circuits for only one target metal (e.g. copper or gold), discarding companion minerals.
  • Severe Mass Inefficiency: Less than 5% of total mined ore mass is commercialized. Over 95% is deposited into tailings storage facilities.
  • Logistics & Toll-Smelting Penalties: Raw concentrate is shipped thousands of miles overseas to foreign smelters, forfeiting 40%–60% of commodity value to tariffs and refining deductions.
  • Compounding Tailings Liability: Billions of metric tons of toxic tailings dams remain active environmental, dam-breach, and reclamation balance-sheet liabilities.
The MNI Architecture Shift
  • Multi-Element Portfolio: Treats the host ore as an integrated elemental basket. High-purity silica, alumina, defense minerals, and bullion are recovered in sequence.
  • 70%–90% Mass Monetization: The bulky quartz and alumina host matrix is refined into high-value semiconductor and ceramic products, covering 100% of processing OPEX.
  • On-Site Closed-Loop Circuit: Liquid-phase hydrometallurgical processing operates directly at the mine or tailings gate, bypassing overseas smelters entirely.
  • Zero-Waste Tailings Monetization: Historic mine tailings liabilities are converted into finished commercial ingots and remediated inert sands.
Proprietary Technology Breakthrough

Dissolve, Unlock, Monetize: Continuous Hydrometallurgy

MNI Corp deconstructs the crystalline host rock in a liquid phase, unlocking trapped micro-minerals that mechanical crushing cannot liberate.

1. Closed-Loop Dissolution

Replaces mechanical crushing with liquid-phase ambient dissolution. Proprietary non-cyanide reagents dissolve the crystalline silica-alumina matrix at ambient temperatures.

2. Matrix Liberation

Breaking the host rock liberates high-purity bulk oxides (SiO₂ and Al₂O₃). The revenue from these bulk materials covers 100% of processing OPEX.

3. Multi-Stream Isolation

Selective precipitation recovers platinum group metals, gold, and strategic minerals into certified 99.8%+ purity ingots and compounds on-site.

MNI Chemical Lixiviant Solution
Matrix Dissolution: Active closed-loop pregnant leach solution in reactor.
Pure Oxide Precipitate Cake
Liberated Oxide: High-purity silica/alumina cake post-precipitation.
70–90%
Total Ore Mass Monetized: By monetizing bulk structural oxides alongside trace high-value metals, MNI captures the full economic spectrum.
"What others call waste, we call inventory."
Engineering Process Architecture

The 4-Stage Closed-Loop Process Flow

A modular hydrometallurgical circuit that transforms raw mineral feedstocks into refined commercial outputs in one continuous flowsheet.

STAGE 01

Feedstock Conditioning

Raw ore, crushed rock, or tailings are conditioned with liquid transport fluid to create an optimized slurry density. Operates at ambient temperature and pressure.

Ambient Liquid Slurry
STAGE 02

Matrix Dissolution

Slurry enters continuous closed-loop reactors. Proprietary reagents dissolve the crystalline silica-alumina matrix, transitioning solid rock into liquid molecular phase.

Solid-to-Liquid Unlock
STAGE 03

Selective Partitioning

Precipitation and solvent displacement isolate the bulk silica and alumina fractions. The liquor stream passes through ion-exchange to isolate strategic base and defense metals.

Multi-Stream Isolation
STAGE 04

Product Finishing

Precious metals (PGMs, Gold, Silver) are crystallized and poured into certified investment doré bullion bars on-site. Pure silica and alumina powders are dried and packed.

Doré Bullion & Oxides
100% Closed-Loop Circuit
Reagents are continuously recovered, balanced, and recycled back into Stage 02, minimizing operational chemical consumption.
No Roasting or Smelting Emissions
Zero atmospheric sulfur dioxide (SO₂) or greenhouse off-gassing. Fully compliant with modern environmental air-quality standards.
Modular Scalable Skids
Factory-built containerized reactor skids facilitate rapid on-site commissioning and linear capacity expansion.
Engineering Blueprint // P&ID Architecture

Plant Engineering Design: Closed-Loop Industrial Flowsheet

Process Piping & Instrumentation Diagram (P&ID) detailing continuous digestion, multi-stream separation, acid regeneration, and spray-dry finishing.

MNI Chemical Processing Plant Flowsheet P&ID Diagram

1. Feedstock Leaching & Digestion Train

Reactors T1–T6

Automated chemical feeding, acid-resistant storage tanks, and multi-stage atmospheric digestion reactors with automated temperature and circulation heat-exchangers.

2. SiO₂ & Al₂O₃ Precipitation Circuit

Separation

Selective precipitation unit isolates high-purity silicon dioxide, followed by aluminum hydroxide neutralization and continuous secondary filtration.

3. Closed-Loop Acid Recovery & Wastewater

Zero Discharge

Internal recovery evaporation system regenerates 95%+ of active acid reagents for recycling back to primary leaching, eliminating hazardous environmental effluent.

4. Commercial Spray-Dry Calcining Unit

Dry Powder Ingot

Continuous industrial spray-drying and finishing skid (shown at base of P&ID) delivers ready-to-package commercial quartz and alpha alumina powders directly on-site.

Metallurgical Mass Balance

Mass Balance Yield per 1,000 kg (1 Tonne) Processed

Independent laboratory characterization reveals the comprehensive output profile unlocked from complex mineral feedstocks.

Output Commodity Classification Recovered Yield / MT Output Product Purity Target Commercial Market
Silicon Dioxide (SiO₂) Foundation Oxide ~380 kg (38.0%) 99.83% – 99.93% High Purity Semiconductor fused quartz, solar PV glass, microelectronics
Refined Alumina (Al₂O₃) Foundation Oxide ~220 kg (22.0%) 99.85% – 99.87% Alpha Grade Technical ceramics, sapphire wafer substrates, battery separators
Titanium (Ti) Defense Critical ~10.5 kg (1.06% in-situ) 99.7% Sponge Precursor Aerospace airframes, naval defense alloys, armor plating
Precious Metals (Pt, Pd, Rh, Ir, Au, Ag) Precious Bullion ~3.1 kg combined 99.95%+ Certified Bullion Green hydrogen electrolyzers, industrial catalysis, investment bullion
Strategic Base Metals (Sc, V, Zn) Strategic Energy ~1.4 kg combined Industrial Chemical Grade Lightweight scandium aircraft alloys, grid-scale VRFB battery storage
Foundation Oxides
SiO₂ + Al₂O₃ Bulk Volume
~600 kg
Strategic & Defense
Titanium, Scandium, Vanadium
~11.9 kg
Precious Bullion
PGMs, Fine Gold & Silver
~3.1 kg
Technical Verification // Laboratory Audit

Independent Laboratory & Metallurgical Validation

Multi-facility independent assay testing confirms repeatable, high-purity elemental extraction across all target commodity streams.

Refined Palladium Button Physical Doré
Direct Physical Recovery
Refined Palladium Button
Solid doré bullion button recovered directly from dissolution pregnant leach liquor via on-site precipitation and electrowinning.
Assayed at 99.95%+ Doré purity without pyrometallurgical smelting.

Enviro-Chem Analytical, Inc.

May 2026 Audit

Under Lab Director Liese K. Thompson, testing was performed across 3 independent laboratories using dual-operator XRF scanning and standard dissolution protocols.

Target Material Feedstock Grade Validated Product Purity Commercial Significance
Silica (SiO₂) ~38% (380 kg/t) 99.83% – 99.93% Semiconductor & tech-glass grade, scalable to 6N–8N
Alumina (Al₂O₃) ~22% (220 kg/t) 99.85% – 99.87% High-purity alpha grade for technical ceramics & substrates
Platinum Group Metals Concentrated stream 99.95%+ Doré Bullion Ammonium hexachloroplatinate test proves producible purified PGMs (43.6% Pt salt)
Titanium (Ti) 1.06% in-situ (10.5 kg/t) 99.7% Sponge Precursor Direct recovery from bulk sand without chlorination smelting
Validation Conclusion: Complete technical de-risking achieved. Multi-laboratory verification confirms repeatable, high-purity multi-element extraction with distinct clarity between in-situ grade and refined commercial purity.
Triplicate Lab Verification
Financial Modeling & Margin Expansion

Compelling Economics Under Severe Safety Cuts

We do not sell best-case scenarios: Financial projections apply severe arbitrary safety discounts to all laboratory assays.

Rigorous Buffer

15x PGM Safety Cut

Actual lab-confirmed Platinum Group Metal yields were divided by 15 in the baseline economic model. This represents a 3x concentrate reduction plus a massive 5x arbitrary safety discount.

Severe downside stress-testing
Conservative Volume

35% Bulk Recovery

The financial model assumes only 35% of total available high-purity silica and alumina is successfully recovered and sold, ignoring 65% of recoverable bulk mass.

65% un-modelled bulk upside
The Net Result

$1,160 – $2,700 / Ton

Even under these penal cuts, gross modeled revenue is $1,160–$2,700 per metric ton processed. Theoretical unadjusted gross potential exceeds $5,000–$10,000/ton.

High-margin operational floor
Economic Architecture
Bulk Oxides Cover 100% of OPEX • Precious & Critical Metals Provide Pure Profit Margin
$700 – $800 / MT
Net PGM Contribution (After 15x Cut)
Field Execution & Commercial Delivery

Modular Processing via Licensed Operating Entities

MNI Corp licenses its proprietary chemical architecture to dedicated operating entities deploying on-site turnkey extraction units.

1. MNI Corp (Licensor)

MNI Corp retains all core chemical formulation IP, patents, process controls, and specialized reagent supply chains. MNI designs the modular plant blueprint and licenses territorial operating rights.

Pure IP & Reagent Licensor

2. Operating Entities

Special-purpose operating companies and commercial joint ventures deploy factory-assembled, containerized processing plants directly at mine sites, alluvial deposits, or tailings dams.

Turnkey On-Site Deployment

3. Mine & Feedstock Partners

Asset owners provide feedstock material (run-of-mine ore or tailings). The licensed plant converts raw dirt directly into certified doré ingots and refined industrial powders on-site.

Zero Offshore Tolling
On-Site "Dirt to Ingot" Operational Sovereign Capability
By uniting feedstock sizing, chemical dissolution, and final electrowinning inside a single secure on-site perimeter, licensed operating entities bypass all external toll-smelting discounts, overseas shipping, and refining bottlenecks.
Zero Offshore Tolling
Customer Acquisition & De-Risking

Low-Friction Intake: The 50kg Diagnostic Protocol

A standardized commercial engagement funnel that proves metallurgical kinetics and economic yield before capital is committed.

STEP 01

50kg Diagnostic Sample

Mining operators or tailings holders ship a representative 50kg sample of their material to MNI's metallurgical intake laboratory under mutual NDA.

STEP 02

Quantitative Assay & Kinetics

ICP-MS and XRF assays establish the full elemental matrix, testing reaction rates, dissolution kinetics, and reagent consumption parameters.

STEP 03

Recovery & Yield Report

MNI generates a certified diagnostic report detailing exact recoverable yields across bulk oxides, critical defense minerals, and precious bullion.

STEP 04

Commercial Plant Licensing

Upon validated yield viability, MNI and the asset partner execute a modular plant licensing agreement or tailings remediation JV.

Target Partner 1: Active Mine Operators
Mines seeking on-site refining to avoid offshore tolling charges and monetize co-occurring companion metals in their existing ore streams.
Target Partner 2: Tailings Liabilities
Holders of historic stamp-mill and flotation tailings looking to convert environmental dam liabilities into immediate cash flow.
Target Partner 3: Strategic Offtakers
Aerospace and defense contractors requiring sovereign, certified US/Western-origin titanium, scandium, and high-purity silicon.
Flagship Reference Asset & Valuation

The Texas Economics: Multi-Generational Asset Scale

Eudaly Mine (Crane County, Texas): Permian Basin infrastructure corridor backing $105 Billion – $126 Billion+ theoretical gross asset value.

Proven Floor Asset

~75 Million Tons

~2,098 mineable acres across 9 defined mine blocks confirmed by the 2023 Westward Report. Permitted with 0–20 ft overburden in Crane County, TX.

Model Basis (3.5M Tons)

$105B – $126B+ Gross

Financial valuation is modeled strictly on an initial 3.5M ton subset (~4.7% of deposit), representing a 106-year operational life at 100 TPD scale.

Expansion Horizon

16,000 Adjacent Acres

Vast contiguous position containing ~570M tons (7.6x multiplier). Unmodelled upside elements include Scandium (121 g/t) & Zirconium (233 g/t).

Target Commodity Fraction Estimated Volume (3.5M Ton Basis) Theoretical Gross Value Range Strategic Market Importance
High-Purity Silica (SiO₂ 6N–8N) ~1.33 Million Metric Tons $2.69 Billion – $6.12 Billion Domestic semiconductor wafers & solar glass precursor
Refined Alumina (Al₂O₃) ~770,000 Metric Tons $539 Million – $3.67 Billion Sapphire substrate wafers & technical ceramics
Platinum (Pt) ~14.0 Million Troy Ounces $13.09 Billion – $15.58 Billion Green hydrogen electrolyzers & chemical catalysis
Rhodium & Iridium (Rh / Ir) ~10.0M oz (Rh) / ~5.6M oz (Ir) $70.24 Billion – $83.05 Billion Ultra-critical strategic defense & high-temp alloys
Palladium (Pd) ~12.25 Million Troy Ounces $11.02 Billion – $13.47 Billion Electronics conductors, automotive & fuel cells
Asset Floor Summary: Crane County, Texas sits in a premier mining-friendly jurisdiction with immediate access to Permian Basin power, road, and Gulf Coast logistics, supported by the Texas CHIPS Act.
106-Year Initial Mine Life
Capital Allocation & Investment Plan

Capital Phasing: $35.1 Million Total Investment Plan

A phased, de-risked development roadmap across pilot validation, commercial capacity, and multi-generational land position.

Phase 1: Pilot $7.4M

Demonstration & Tooling

Fixed Plant (100 MT/d capacity):$3.2M
Movable Equipment & Skids:$1.5M
Operating Capital (Labor/Chem):$1.2M
Warehousing & Clean Rooms:$1.5M
Phase 2: Commercial $2.7M

Scale-Up & High Purity

High-Purity Finishing Infrastructure:$2.7M
Expands system to 12 reactors (100 TPD / ~33,000 tons/yr). Achieves steady-state commercial sales of bulk 99.9% SiO₂ and Al₂O₃, with initial PGM bullion deliveries.
Phase 3: Expansion $25.0M

16,000-Acre Land Position

Land Acquisition (~16,000 acres):$25.0M
Secures one of the largest contiguous mineral positions in West Texas (~570M tons), providing multi-generational sovereign supply and global fleet scale.
TOTAL CAPEX: $35.1 MILLION Three-Phase Execution Plan
Phased capital expenditure de-risks investor capital while unlocking multi-billion dollar asset value and immediate commercial cash flow.
Request Data Room & Term Sheet
contact@mnicorp.org • Strict NDA
MNI Corp
Investment Summary // Next Steps

Thank You for Your Time & Consideration

MNI Corp is pioneering the next generation of domestic critical mineral extraction, semiconductor feedstocks, and strategic metals.

Execution Certainty
Fully Validated Flowsheet

Independent multi-lab audits confirm 99.8%+ oxide purities and direct physical doré bullion recovery with zero cyanide.

Anchor Jurisdiction
West Texas Asset Base

Eudaly Mine, Crane County TX provides an initial 3.5M ton resource floor ($105B+ gross in-situ value) with immediate 16,000-acre expansion.

Phased Deployment
$35.1M Total CAPEX

Phase 1 demonstration at $7.4M delivers commercial cash flow and de-risks subsequent phases while preserving maximum equity upside.

Executive Inquiries
contact@mnicorp.org
Corporate Portal
mnicorp.org
Confidential & Proprietary • MNI Corp • Protected under Non-Disclosure Agreement (NDA)
Presentation Slide Index
Select any slide to jump directly to it